Cart
Your cart is currently empty.

BOLT 0S1585 - Caterpillar

Money Icon

Money Back

15 days money back guarantee.

Credit Card Icon

Secure Checkout

We ensure 100% Payment Secure.

Compatible equipment models: 0S1585:


CHALLENGER  65   65C   65E   70C   75C   75D   75E   85C   85D   85E   95E  
COLD PLANER  PR-450   PR-750B  
ENGINE - MACHINE  3304  
EXCAVATOR  215   225   225D   229   231D   235   245  
GAS ENGINE  CG137-08   CG137-12   G3304   G3304B   G3306   G3306B   G3406   G3408   G3408B   G3408C   G3412   G342C   G343   G3508   G3508B   G3512   G3512B   G3516   G3516B   G3520B   G353D   G3606   G3606B   G3608   G3612   G3616   G379   G398   G399  
GEN SET ENGINE  3208   3304   3304B   3306   3306B   3406   3406B   3406C   3406E   3408   3408B   3412   3412C   3456   3508   3508B   3512   3512B   3516   3516B   D379B   D398B   D399   G3412C   G3508   G3512   G3516   G3516B   G3520B  
GEN SET-MILITARY  3608  
GENERATOR  SR4  
GENERATOR SET  3304B   3306B   3406C   3406E   3408C   3412   3412C   3456   3508   3508B   3508C   3512   3512B   3512C   3516   3516B   3516C   C15   C15 I6   C175-16   C18   C18 I6   C27   C32   G3306   G3406   G3412   G3508   G3512   G3512E   G3516   G3516B   G3516C   G3516E   G3516H   G3520B   G3520C   G3520E  
INDUSTRIAL ENGINE  3116   3126   3176B   3208   3304   3306   3306B   3406   3406B   3406C   3406E   3408   3408B   3408C   3408E   3412   3412C   3412E   3456   3508   3508B   3512   3512B   3512C   3516   3516B   C-15   C-16   C11   C13   C15   C18   C27   C32   D320A   D342   D342C   D343   D346   D348   D349   D353C   D379   D398   D399  
LOCOMOTIVE ENGINE  3508   3508B   3508C   3512   3512B   3512C   3516   3516B   3516C  
MARINE AUXILIARY  3508B   3508C   3512   3512B   3512C   3516B   3516C   3608  
MARINE ENGINE  3208   3304   3304B   3306   3306B   3406   3406B   3406C   3406E   3408   3408B   3408C   3412   3412C   3412D   3412E   3508   3508B   3508C   3512   3512B   3512C   3516   3516B   3516C   3606   3608   3612   3616   3618   C15   C18   C280-12   C280-16   C280-6   C280-8   C30   C32   D315   D326F   D330A   D333A   D333B   D334   D336   D337   D337F   D342   D342C   D343   D346   D348   D349   D353C   D364   D375D   D379A   D397D   D398A   D399  
MARINE GEAR  3181   3192  
MARINE TRANSMISSION  7211   7231   7241   7251   7261   7271  
PETROLEUM ENGINE  3412E   3508B   3508C   3512   3512B   3512C   3516C   C11   C13   C15   C18   C27   C32  
PETROLEUM GEN SET  C15   C18   C27   C32  
PETROLEUM PACKAGE  CX31-C13I   CX31-C15I   CX35-P800   TH35-C11I   TH35-C15I   TH35-C15T  
PETROLEUM TRANSMISSION  CX48-P2300   TH35-E81   TH48-E70   TH48-E80   TH55-E70  
POWER MODULE  3516C   C18   PM3412   PM3456   PM3508   PM3512   PM3516   PMG3516   PP3516   XQC1200   XQC1600  
PUMP  WS223 SS  
PUMP POWER END  WSP273  
PUMPER  HT400   SCT673   SPF343   SPF343C   SPS342   SPS343   SPT342   SPT343  
REMAN ENGINE  3516B  
SOIL COMPACTOR  815  
SOIL STABILIZER  SS-250  
TRACK FELLER BUNCHER  FB221  
TRACK-TYPE TRACTOR  30/30   D4D   D5   D6C   D6D   D9G   D9L   DEUCE  
TRACTOR  772  
TRUCK  777B   785  
TRUCK ENGINE  1673   1673B   1673C   1676   1693   3116   3208   3306   3306B   3306C   3406   3406B   3406C   3406E   3408   C-15   C-16   C11   C15  
VEHICULAR ENGINE  3508   3512   3516   D346   D348   D349  
VIBRATORY COMPACTOR  CB-534  
WHEEL LOADER  920   966C   980B  
WHEEL TRACTOR  621B   637D   Caterpillar
show more

Information:

Installation Procedure
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g01119759
Loosen jam nut (8) and adjustment screw (7). Loosen jam nut (10) and adjustment screw (9).
Illustration 2 g01131377
Illustration 3 g01158612
Valve bridge for dowel installations
Illustration 4 g01946786
Floating valve bridge
(X) Round pocket
(Y) Slotted pocket
(Z) Outside of engine
Apply clean engine oil to pushrod (5).
Apply clean engine oil to valve pushrods (4), and the cup of the valve lifters. Install valve pushrods (4) in the original location.
Valve bridge assemblies for dowel installations have an adjustment screw and a jam nut. Use the following procedure to install this configuration.
Loosen adjustment screw (11) and jam nut (12) on bridge assembly (3).
Coat these items with clean engine oil: the dowels, the receptacle of the bridge assembly for the dowels and the uppermost contact surface of bridge assembly (3).
Place bridge assembly (3) into position on the dowel. Apply a downward force of 5 to 45 N (1 to 10 lb) on the uppermost contact surface of bridge assembly (3). While you apply the force, turn adjustment screw (11) until the adjustment screw contacts the valve stem.
Turn the adjustment screw for an additional 20 to 30 degrees (1/3 to 1/2 of the hex).
Hold the adjustment screw in position and tighten jam nut (12) to a torque of 30 4 N m (22 3 lb ft).
For floating valve bridge assemblies, use the following procedure.
Apply clean engine oil to the contact surface of bridge assemblies (3) and the valve stems. Install bridge assemblies (3) on the valve stems.
Install the bridge assemblies with the round pocket toward the outside of the engine. Refer to Illustration 4.
Ensure that the crankshaft and the camshafts are in time with each other. Also ensure that the adjustment screws in the rocker arms are loosened completely before the bolts on the rocker shaft are tightened or damage to the valves and the pistons may occur.
If the rocker shaft is not positioned correctly, the oil supply to the sleeve bearings in the rocker arm will be shut off. This will cause seizure of the bearings and severe damage to the engine.Be sure to orient the rocker shaft in the correct position.
Place rocker shaft assembly (2) in position on valve mechanism cover base (6). Make sure that valve pushrods (4) and pushrod (5) are aligned with the rocker arms. Install bolts (1). Tighten the bolts evenly to a torque of 215 40 N m (160 30 lb ft).Note: The rocker shaft dowel must be located on the left-hand side of the rocker shaft when installed.
Illustration 5 g01119849
Adjust the valve lash according to Testing and Adjusting, "Valve Lash and Valve Bridge Adjustment". Hold adjustment screw (7) of the rocker arm assembly and tighten jam nut (8) to a torque of 70 15 N m (52 11 lb ft).
Adjust the electronic unit injector lash according to Testing and Adjusting, "Fuel Injector Adjustment". Hold adjustment screw (9) of the rocker arm assembly and tighten nut (10). If nut (10) is 5/8 inch thread,

Last updated: March 8, 2025

At APSS, we are committed to delivering your orders efficiently and securely. We partner with leading international carriers, including FedEx, USPS, and DHL, to ensure fast and reliable shipping from Singapore to various countries worldwide.

Processing & Shipping Times

  • Orders are processed within 1-3 business days after payment confirmation.
  • Standard international shipping times vary based on the destination:
    • Asia-Pacific: 3-7 business days
    • Europe & North America: 5-10 business days
    • Other Regions: 7-14 business days
  • Expedited shipping options are available at checkout for select regions.

Shipping Carriers

We work with trusted carriers to ensure safe and timely delivery of your orders:

  • FedEx – Express international shipping with tracking.
  • USPS – Cost-effective shipping to the United States.
  • DHL – Fast global delivery with premium service.

Tracking details will be provided once your order has been shipped.

Shipping Costs & Duties

  • Shipping fees are calculated at checkout based on destination and package weight.
  • International orders may be subject to customs duties and taxes. These charges are the responsibility of the recipient and vary by country.
  • APSS is not liable for any delays caused by customs processing.

Order Tracking

Once your order has been shipped, you will receive a tracking number via email. You can track your shipment using the respective carrier’s website:

Lost or Delayed Shipments

If your order is delayed beyond the estimated delivery time, please contact our customer support at procurement@apss.com. We will work with the carrier to resolve any issues.

For lost shipments, please notify us within 15 days of the expected delivery date so we can investigate and assist with a resolution.

Address Accuracy & Changes

  • Please ensure that your shipping address is correct before completing your purchase.
  • Address changes cannot be made once the order has been shipped.
  • APSS is not responsible for orders shipped to incorrect addresses provided by the customer.

Contact Us

For any shipping-related inquiries, please reach out to us at:

APSS Headquarters
3 Gambas Crescent, #06-10 Nordcom I, Singapore 757088
Email: procurement@apss.com

Translation missing: en.general.search.loading